29
2018
-
03
Operation method of electric plug - in vibrator
Operation method of electric plug - in vibrator (1), plug-in vibrator on the motor power supply, should be installed leakage protection device, grounding or zero should be safe and reliable. (2), the
Author:
Operation method of electric plug - in vibrator
(1), plug-in vibrator on the motor power supply, should be installed leakage protection device, grounding or zero should be safe and reliable.
(2), the operator should be through the electricity education, operation should wear insulated shoes and insulated gloves.
(3), the cable should meet the required length of the operation, the cable can not be pressed on the goods or the vehicle squeeze, prohibit the use of cable drag or hanging vibrator.
(4), before use, should check the ministry and confirm the connection is firm, the direction of rotation is correct.
(5), the vibrator shall not be in the initial condensed concrete, floor, scaffolding and dry hard ground on the test vibration. When the service is interrupted, disconnect the power supply.
(6), the operating, the vibration bar hose bending radius of not less than 500mm, and not more than two bends, the operation should be vertical vibration of the vertical bar into the concrete, not hard hard, oblique push or let the bar Head, and shall not be all inserted into the concrete, the insertion depth should not exceed 3/4 of the rod length, should not touch the reinforced, core and embedded parts.
(7), vibration bar hose shall not be broken, when the hose is used for too long to grow, it should be promptly repaired or replaced.
(8), work to stop the need to move the vibrator, you should first turn off the motor, and then cut off the power. Do not drag the motor with a hose.
(9), the work is completed, the motor, hose, vibration bar clean up, and should be required to carry out maintenance operations. When the vibrator is stored, do not pile the hose, should be put straight, and should take measures to prevent the motor.
Related news
